HOME > INSTITUTIONAL CLIENTS

INSTITUTIONAL CLIENTS

Cost Replacement New

Cost Replacement New

Cost Replacement New is the aggregate sum required for replacing specific building structure/s with a new one that provides the same utility and having equivalent desirability inclusive of all necessary installations required for normal operation. It is based on current market prices for labor, materials, equipment, contractor’s overhead, normal economic profit, architectural, and any other applicable fees.

Reserve Fund Studies

Reserve Fund Studies

RESERVE FUND STUDIES
Our Reserve Fund Study reports are forward-looking analysis which estimates the timing of major common area elements replacement and/or substantial repair expenses in order to develop a prudent strategy for accumulating funds which will be used for covering such expenses.

Green Buildings

Green Buildings

GREEN BUILDINGS
In order to achieve the lower consumption of energy, water, or any other depleting resources along with higher comfort of living the LLED certified buildings utilize specific building materials at the construction stage and sophisticated engineering systems during occupancy.

Rural and Agricultural Farm Appraisal

Rural and Agricultural Farm Appraisal

RURAL AND AGRICULTURAL FARM APPRAISAL
There are many factors that affect and need to be carefully considered when valuing agricultural land. Our valuations make sure they are all accounted for.